Well, day one is complete. We started at the house that the girls will be living at, since there was electrical, bathrooms, and roofing to be done all the interns started outside, we weeded, trim trees, raked, clean the gutters, raked leaves, swept the roof to get all the moss off, and then sprayed everything with weed killer, bug killer, and moss killer. We also took off paneling in the kitchen, cleaned out the fridge, cleaned the stove, swept the kitchen floor, put the dishes in a box, threw the leftover food away, and cleaned the counters. Our leadership team (Interns) worked so well that we were off earlier than what was set for us to get off at. I absolutely love everyone in the internship and think that we are going to make a great team. Since the electrical, bathrooms and roofing will still need to be worked on tomorrow, there may not be much we can do inside the house. We still need to figure out the garage and clean all that out, since that will turn into our lounge, we need to paint both inside and out, we will need to clean all the bedrooms, clean the living room, clean the windows, and much more, but thats hard to do when there is 7 interns plus workers trying to get all the bathrooms done and more, so there may not be a lot that we can do. Although we've run into these problems, I'm thankful that we all get to spend time and grow together and learn more about the others. I can't wait to start painting, and to get the house done. I think the house has a lot of potential to look very nice and be a very cute house for more interns to come.
Well I think thats about it for tonight!
Thanks for reading, Love you guys!
~Kayla (The Intern)
No comments:
Post a Comment